TERMINALS OF ECU
System information · Vehicles built from Aug 2008
Versions by build date: Nov 2005 – Jul 2008 from Aug 2008
| CHECK SLIDING ROOF DRIVE GEAR SUB-ASSEMBLY (SLIDING ROOF ECU) |
![]() ![]() |
Disconnect the R9 ECU connector.
Measure the resistance and voltage of the wire harness side connector.
Symbols (Terminal No.)
Wiring Color
Terminal Description
Condition
Specified Condition
B (R9-1) - E (R9-2)
L - W-B
+B power supply
Always
10 to 14 V
IG (R9-5) - E (R9-2)
L - W-B
Power supply
Ignition switch off
Below 1 V
IG (R9-5) - E (R9-2)
L - W-B
Power supply
Ignition switch on (IG)
10 to 14 V
DWN (R9-7) - E (R9-2)
GR - W-B
Sliding roof motor open
SLIDE OPEN switch OFF
10 kΩ or higher
DWN (R9-7) - E (R9-2)
GR - W-B
Sliding roof motor open
SLIDE OPEN switch ON
Below 1 Ω
UP (R9-9) - E (R9-2)
G - W-B
Sliding roof motor close
TILT UP switch OFF
10 kΩ or higher
UP (R9-9) - E (R9-2)
G - W-B
Sliding roof motor close
TILT UP switch ON
Below 1 Ω
E (R9-2) - Body ground
W-B - Body ground
Ground
Always
Below 1 Ω
Reconnect the R9 ECU connector.
Measure the voltage of the connector.
Symbols (Terminal No.)
Wiring Color
Terminal Description
Condition
Specified Condition
DWN (R9-7) - E (R9-2)
GR - W-B
Sliding roof motor open
Ignition switch on (IG), sliding roof closed, SLIDE OPEN switch OFF
Below 1 V
DWN (R9-7) - E (R9-2)
GR - W-B
Sliding roof motor open
Ignition switch on (IG), sliding roof closed, SLIDE OPEN switch ON
10 to 14 V
UP (R9-9) - E (R9-2)
G - W-B
Sliding roof motor closed
Ignition switch on (IG), sliding roof open, TILT UP switch OFF
Below 1 V
UP (R9-9) - E (R9-2)
G - W-B
Sliding roof motor closed
Ignition switch on (IG), sliding roof open, TILT UP switch ON
10 to 14 V
- If the result is not as specified, the ECU may have a malfunction.
- If the result is not as specified, the ECU may have a malfunction.