Removal / installation · Vehicles built from Aug 2007
1.
REMOVE V-BANK COVER SUB-ASSEMBLY
Detach the 3 clips and remove the V-bank cover.
2.
DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
3.
DRAIN ENGINE COOLANT
Loosen the radiator drain cock plug.
HINT:
Collect the coolant in a container and dispose of it according to the regulations in your area.
Remove the radiator reservoir cap.
CAUTION:
Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.
Loosen the 2 cylinder block drain cock plugs.
4.
REMOVE AIR CLEANER CAP SUB-ASSEMBLY
Disconnect the mass air flow meter connector.
Disconnect the VSV (air intake control) connector.
Disconnect the 2 wire harness clamps and 2 vacuum hoses.
Disconnect the No. 2 ventilation hose from the air cleaner hose.
Loosen the No. 1 air cleaner hose clamp.
Unfasten the 2 hook clamps, and then remove the air cleaner cap.
Remove the air cleaner filter element from the air cleaner case.
5.
REMOVE THROTTLE BODY
Disconnect the 2 water by-pass hoses from the throttle body.
Disconnect the control motor connector.
Remove the 4 bolts, throttle body and wire harness clamp stay.
Remove the gasket from the intake air surge tank.
6.
REMOVE INTAKE AIR SURGE TANK ASSEMBLY
Disconnect the 2 water by-pass hoses from the throttle body.
Disconnect the vapor feed hose.
Disconnect the throttle body connector and clamp.
Disconnect the connector.
Disconnect the No. 1 ventilation hose and vacuum hose.
Remove the 2 bolts and throttle body bracket.
Remove the 2 bolts and No. 1 surge tank stay.
Using a 5 mm socket hexagon wrench, remove the 4 bolts.