Home › CRUISE CONTROL SYSTEM › CRUISE CONTROL › CRUISE CONTROL MAIN SWITCH (for Pin Type)

CRUISE CONTROL MAIN SWITCH (for Pin Type) > INSTALLATION

for Preparation Click here



1. INSTALL CRUISE CONTROL MAIN SWITCH


B220670
  1. Install the switch with the 2 screws.

  1. Connect the connector.



2. INSTALL STEERING PAD ASSEMBLY


B220979
  1. Support the steering pad with one hand as shown in the illustration.

  1. Connect the 2 airbag connectors.

    NOTICE:
    When handling the airbag connector, do not damage the airbag wire harness.

  1. Connect the horn connector.

  1. Install the steering pad after confirming that the circumference grooves of the screws are caught on the screw case.

  1. Attach the 2 spring to steering pad.



3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


4. CHECK SRS WARNING LIGHT
  1. Check the SRS warning light (Click here).