Home › BODY › EXTERIOR › ROOF RACK

ROOF RACK > INSTALLATION

for Preparation Click here



1. REPLACE ROOF CARRIER SEAL


    B127981
  1. Remove the seals.

  1. Install new seals as shown in the illustration.



2. INSTALL ROOF RACK LEG FRONT LH
  1. Install the leg cushion front.

  1. Install the roof rack leg front with the 2 screws.

    Torque:
    3.9 N*m{ 40 kgf*cm , 35 in.*lbf }



3. INSTALL ROOF RACK LEG REAR LH
  1. Install the leg cushion rear.

  1. Install the roof rack leg rear with the 2 screws.

    Torque:
    3.9 N*m{ 40 kgf*cm , 35 in.*lbf }



4. INSTALL ROOF RACK ASSEMBLY LH


    B127980
  1. Install the roof rack with the 4 bolts.

    Torque:
    38 N*m{ 387 kgf*cm , 28 ft.*lbf }



5. INSTALL ROOF RACK LEG COVER REAR LH


    B134713E01
  1. Install the leg cover.

    1. Attach the rib to the bar.

    2. Attach the 4 claws.



6. INSTALL ROOF RACK LEG COVER FRONT LH


    B134712E01
  1. Install the leg cover.

    1. Attach the rib to the bar.

    2. Attach the 4 claws.