Home › ENGINE ยท 2AD-FTV › INTAKE › TURBOCHARGER

TURBOCHARGER > INSTALLATION

for Preparation Click here



1. INSTALL TURBOCHARGER SUB-ASSEMBLY


    A197529
  1. Install a new gasket and the turbocharger with 3 new nuts.

    Torque:
    60 N*m{ 612 kgf*cm , 44 ft.*lbf }

  1. Connect the vacuum hose.



2. INSTALL TURBOCHARGER STAY


    A197528E01
  1. Install the 2 collars and a new turbocharger stay with the 2 nuts.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }

    Text in Illustration 
    *1
    New Turbocharger Stay
    *2
    Collar

    NOTICE:
    Do not reuse the turbocharger stay.



3. INSTALL NO. 2 TURBO OIL PIPE


    A197527E01
  1. Install the No. 2 turbo oil pipe and 2 new gaskets with the 2 union bolts.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

  1. Connect the vacuum hose.



4. INSTALL NO. 5 WATER BY-PASS PIPE


    A197525
  1. Install the No. 5 water by-pass pipe with the 2 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



5. CONNECT NO. 3 WATER BY-PASS HOSE


A197526


6. INSTALL NO. 1 TURBO INSULATOR


    A197524
  1. Install the No. 1 turbo insulator with the 2 bolts.

    Torque:
    21 N*m{ 209 kgf*cm , 15 ft.*lbf }



7. INSTALL TURBO OIL OUTLET PIPE
  1. Install 2 new gaskets to the turbo oil outlet pipe.



    A197523E01
  1. Install the turbo oil outlet pipe with the 2 bolts and 2 nuts.

    Torque:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }

    Text in Illustration 
    *1
    Nut



8. INSTALL EGR COOLER WITH PIPE ASSEMBLY
  1. Install the EGR cooler with pipe assembly (Click here).