Home › ENGINE · 2AD-FHV › INTAKE › VACUUM REGULATING VALVE

VACUUM REGULATING VALVE > INSPECTION

for Preparation Click here



1. INSPECT VACUUM REGULATING VALVE ASSEMBLY


    A201829E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    11.1 to 12.5 Ω

    Text in Illustration 
    *1
    Component without harness connected
    (Vacuum Regulating Valve)



  1. Inspect vacuum regulating valve operation.



      A201833E01
    1. Check that air flows from port E to G.



    2. A201834E01
    3. Apply battery voltage to the terminals as shown in the illustration.

    4. Check that air flows from port E to the filter.
      If the result is not as specified, replace the vacuum regulating valve assembly.