Home › TRANSMISSION · U660F AUTOMATIC TRANSAXLE › VALVE BODY ASSEMBLY

VALVE BODY ASSEMBLY > INSPECTION

for Preparation Click here



1. INSPECT SHIFT SOLENOID VALVE SL


C188295E02
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    Shift solenoid valve SL connector terminal - Shift solenoid valve SL body
    20°C (68°F)
    11 to 15 Ω

    Text in Illustration 
    *1
    Component without harness connected
    (Shift Solenoid Valve SL)

  1. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

    OK:
    Measurement Condition
    Specified Condition
    1. Battery positive (+) → Shift solenoid valve S4 connector
    2. Battery negative (-) → Shift solenoid valve S4 body
    Valve moves and makes an operating noise

    If the result is not as specified, replace the solenoid valve.



2. INSPECT SHIFT SOLENOID VALVE SLT


C197715E05
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    5.0 to 5.6 Ω

    Text in Illustration 
    *1
    Component without harness connected
    (Shift Solenoid Valve SLT)

  1. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

    OK:
    Measurement Condition
    Specified Condition
    1. Battery positive (+) with a 21 W bulb → Terminal 1
    2. Battery negative (-) → Terminal 2
    Valve moves and makes an operating noise

    If the result is not as specified, replace the solenoid valve.



3. INSPECT SHIFT SOLENOID VALVE SLU


C197715E05
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    5.0 to 5.6 Ω

    Text in Illustration 
    *1
    Component without harness connected
    (Shift Solenoid Valve SLU)

  1. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

    OK:
    Measurement Condition
    Specified Condition
    1. Battery positive (+) with a 21 W bulb → Terminal 1
    2. Battery negative (-) → Terminal 2
    Valve moves and makes an operating noise

    If the result is not as specified, replace the solenoid valve.



4. INSPECT SHIFT SOLENOID VALVE SL1


C197715E05
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    5.0 to 5.6 Ω

    Text in Illustration 
    *1
    Component without harness connected
    (Shift Solenoid Valve SL1)

  1. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

    OK:
    Measurement Condition
    Specified Condition
    1. Battery positive (+) with a 21 W bulb → Terminal 1
    2. Battery negative (-) → Terminal 2
    Valve moves and makes an operating noise

    If the result is not as specified, replace the solenoid valve.



5. INSPECT SHIFT SOLENOID VALVE SL2


C197715E05
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    5.0 to 5.6 Ω

    Text in Illustration 
    *1
    Component without harness connected
    (Shift Solenoid Valve SL2)

  1. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

    OK:
    Measurement Condition
    Specified Condition
    1. Battery positive (+) with a 21 W bulb → Terminal 1
    2. Battery negative (-) → Terminal 2
    Valve moves and makes an operating noise

    If the result is not as specified, replace the solenoid valve.



6. INSPECT SHIFT SOLENOID VALVE SL3


C197715E05
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    5.0 to 5.6 Ω

    Text in Illustration 
    *1
    Component without harness connected
    (Shift Solenoid Valve SL3)

  1. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

    OK:
    Measurement Condition
    Specified Condition
    1. Battery positive (+) with a 21 W bulb → Terminal 1
    2. Battery negative (-) → Terminal 2
    Valve moves and makes an operating noise

    If the result is not as specified, replace the solenoid valve.



7. INSPECT SHIFT SOLENOID VALVE SL4


C197715E05
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    5.0 to 5.6 Ω

    Text in Illustration 
    *1
    Component without harness connected
    (Shift Solenoid Valve SL4)

  1. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

    OK:
    Measurement Condition
    Specified Condition
    1. Battery positive (+) with a 21 W bulb → Terminal 1
    2. Battery negative (-) → Terminal 2
    Valve moves and makes an operating noise

    If the result is not as specified, replace the solenoid valve.