CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY > INSPECTION |
| 1. INSPECT CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY |
![]() |
Measure the resistance of the oil control valve.
| Tester Connection | Specified Condition |
| 1 (+B) - 2 (GND) | 6.9 to 7.9 Ω at 20°C (68°F) |
![]() |
Check the operation.
Connect the battery positive (+) lead to terminal 1 and negative (-) lead to terminal 2, and check the movement of the valve.
| Condition | Specified Condition |
| Battery positive (+) voltage is applied | Valve moves in black arrow direction shown in illustration |
| Battery positive (+) voltage is cut off | Valve moves in white arrow direction shown in illustration |