CYLINDER HEAD > REPLACEMENT |
| 1. REPLACE INTAKE VALVE GUIDE BUSH |
![]() |
Heat the cylinder head to 80 to 100°C (176 to 212°F).
Place the cylinder head on wooden blocks.
![]() |
Using SST and a hammer, tap out the guide bush.
![]() |
Heat the cylinder head to 80 to 100°C (176 to 212°F).
Place the cylinder head on wooden blocks.
![]() |
Using a caliper gauge, measure the bush bore diameter of the cylinder head.
Install the STD bush if the diameter is within the specified diameter.
![]() |
Using SST and a hammer, tap in a new guide bush to the specified protrusion height.
![]() |
Using a sharp 5.5 mm reamer, ream the valve guide bush to the standard specified clearance between the valve guide bush and valve stem.
| 2. REPLACE EXHAUST VALVE GUIDE BUSH |
![]() |
Heat the cylinder head to 80 to 100°C (176 to 212°F).
Place the cylinder head on wooden blocks.
![]() |
Using SST and a hammer, tap out the guide bush.
![]() |
Heat the cylinder head to 80 to 100°C (176 to 212°F).
Place the cylinder head on wooden blocks.
![]() |
Using a caliper gauge, measure the bush bore diameter of the cylinder head.
Install the STD bush if the diameter is within the specified diameter.
![]() |
Using SST and a hammer, tap in a new guide bush to the specified protrusion height.
![]() |
Using a sharp 5.5 mm reamer, ream the valve guide bush to the standard specified clearance between the valve guide bush and valve stem.
| 3. REPLACE STUD BOLT |
Using E5 and E7 "torx" socket wrenches, remove the 11 stud bolts.
Using E5 and E7 "torx" socket wrenches, install the 11 stud bolts.

| 4. REPLACE RING PIN |
Remove the 4 ring pins.
![]() |
Using a plastic-faced hammer, tap in 4 new ring pins to the specified protrusion height.