Home › ENGINE · 2GR-FE › ENGINE CONTROL SYSTEM › CIRCUIT OPENING RELAY

CIRCUIT OPENING RELAY > ON-VEHICLE INSPECTION

for Preparation Click here



1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL


2. INSPECT INSTRUMENT PANEL JUNCTION BLOCK

NOTICE:
The circuit opening (C/OPN) relay is built into the instrument panel junction block.



    A116124E29
  1. Measure the resistance between the terminals.

    Standard resistance:
    Tester Connection
    Specified Condition
    1B-11 - 1A-8
    10 kΩ or higher
    1B-11 - 1A-8
    Below 1 Ω
    (when battery voltage is applied to terminals IF-4 and IE-5)

    If the result is not as specified, replace the instrument panel junction block.



3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL