Home › ENGINE · 3ZR-FAE › ENGINE CONTROL SYSTEM › IGNITION RELAY NO. 2

IGNITION RELAY NO. 2 > ON-VEHICLE INSPECTION

for Preparation Click here



1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

NOTICE:
w/ Navigation System (for HDD):
After the ignition switch is turned off, the HDD navigation system requires approximately a minute to record various types of memory and settings. As a result, after turning the ignition switch off, wait a minute or more before disconnecting the cable from the negative (-) battery terminal.



2. REMOVE IG2 RELAY
  1. Remove the engine room No. 1 relay block cover.

  1. Remove the IG2 relay from the engine room No. 1 relay block.



3. INSPECT IG2 RELAY


    B060778E14
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    3 - 5
    Battery voltage not applied to terminals 1 and 2
    10 kΩ or higher
    3 - 5
    Battery voltage applied to terminals 1 and 2
    Below 1 Ω

    If the result is not as specified, replace the relay.



4. INSTALL IG2 RELAY


5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL