ROOF DRIP SIDE FINISH MOULDING > INSTALLATION |
| Item | Temperature |
| Vehicle body | 40 to 60°C (104 to 140°F) |
| Clip | 20 to 30°C (68 to 86°F) |
| 1. REPLACE ROOF DRIP SIDE FINISH MOULDING CLIP |
Remove the double-sided tape that remains on the surfaces of the moulding and vehicle body, and then clean the surface with white gasoline.
Using a heat light, heat the clip installation surface of the vehicle body and installation part of the clips.
| 2. INSTALL ROOF DRIP SIDE FINISH MOULDING LH |
![]() |
Install the No. 2 center roof drip side finish moulding and roof drip side finish moulding.
Install the 2 roof drip moulding joint covers to the vehicle body.