Home › CRUISE CONTROL SYSTEM › CRUISE CONTROL › CRUISE CONTROL MAIN SWITCH (for 1AZ-FE, 2AZ-FE)

CRUISE CONTROL MAIN SWITCH (for 1AZ-FE, 2AZ-FE) > INSTALLATION

for Preparation Click here



1. INSTALL CRUISE CONTROL MAIN SWITCH


B127290E10
  1. Install the switch with the 2 screws.

    Torque:
    1.7 to 3.0 N*m{ 17.34 to 30.60 kgf*cm , 15.04 to 26.55 in.*lbf }

  1. Connect the connector.



2. INSTALL STEERING PAD ASSEMBLY


    B127893E01
  1. Support the steering pad with one hand as shown in the illustration.

  1. Connect the 2 airbag connectors.

    NOTICE:
    When handling the airbag connector, do not damage the airbag wire harness.

  1. Connect the horn connector.

  1. Install the steering pad after confirming that the circumference grooves of the screws are caught on the screw case.



    B130245E02
  1. Using a T30 "torx" driver, install the 2 screws.

    Torque:
    8.8 N*m{ 90 kgf*cm , 78 in.*lbf }



3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


4. CHECK SRS WARNING LIGHT
  1. Check the SRS warning light (Click here).