Home › ENGINE ยท 2GR-FE › EMISSION CONTROL › PURGE VALVE

PURGE VALVE > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER SUB-ASSEMBLY


    A137900
  1. Detach the 3 clips and remove the V-bank cover.



2. REMOVE PURGE VSV


    A136126
  1. Disconnect the purge VSV connector.

  1. Disconnect the wire harness clamp.

  1. Disconnect the 2 purge line hoses from the purge VSV.

  1. Remove the bolt and purge VSV.