Home › ENGINE ยท 2AZ-FE › EMISSION CONTROL › PCV VALVE

PCV VALVE > INSTALLATION

for Preparation Click here



1. INSTALL VENTILATION VALVE SUB-ASSEMBLY


    A092670E03
  1. Apply adhesive to 2 or 3 threads of the ventilation valve.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or Equivalent



    A098067E01
  1. Using a 22 mm deep socket wrench, install the ventilation valve.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. Connect the ventilation hose.



2. INSTALL NO. 1 ENGINE COVER


    A124558
  1. Install the cover with the 2 nuts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }



3. CHECK FOR ENGINE OIL LEAKS