Home › ENGINE ยท 1AZ-FE › STARTING › ENGINE SWITCH (w/ Entry and Start System)

ENGINE SWITCH (w/ Entry and Start System) > INSTALLATION

for Preparation Click here



1. INSTALL ENGINE SWITCH


    A133129E01
  1. Attach the 2 claws and install the switch.

  1. Connect the switch connector.



2. INSTALL HEATER CONTROL ASSEMBLY


    A133122
  1. Connect the connectors.

  1. Attach the 3 clips to install the heater control assembly.

  1. Install the 2 screws.



3. INSTALL RADIO RECEIVER (w/ Radio Receiver)
  1. for 3ZR-FAE
    Install the radio receiver assembly with bracket .

  1. for 3ZR-FAE
    Install the radio receiver assembly with bracket .



4. INSTALL STEREO OPENING COVER (w/o Radio Receiver)


B133002
  1. Attach the 4 clips to install the stereo opening cover.

  1. Install the 4 bolts.



5. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL CENTER


B210523
  1. Connect the connector.

  1. Attach the 3 clips and 2 claws to install the cluster finish panel.



6. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL CENTER


B210524
  1. Connect the connector.

  1. Attach the 3 clips and 2 claws to install the cluster finish panel.



7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL