Home › ENGINE ยท 2GR-FE › STARTING › STARTER

STARTER > INSTALLATION

for Preparation Click here



1. INSTALL STARTER ASSEMBLY


    A126955
  1. Install the starter with the 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }



    A126954
  1. Connect the starter connector.

  1. Install the terminal nut and cover the nut with the cap.

    Torque:
    9.8 N*m{ 100 kgf*cm , 88 in.*lbf }



2. INSTALL BATTERY BRACKET REINFORCEMENT


    A124919
  1. Install the bracket reinforcement with the 2 bolts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }



3. INSTALL FRONT BATTERY BRACKET


    A173727
  1. Install the front battery bracket with the 4 bolts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. Attach the 2 wire harness clamps.



4. INSTALL BATTERY
  1. Install the battery and battery insulator.



5. INSTALL BATTERY CLAMP SUB-ASSEMBLY
  1. Attach the hook of the battery clamp to the front battery bracket.

  1. Temporarily tighten the nut and install the bolt.

  1. Adjust the battery clamp position.



    A124917E01
  1. Fully tighten the nut and bolt.

    Torque:
    Bolt:
    17 N*m{ 170 kgf*cm , 12 ft.*lbf }
    Nut:
    4.9 N*m{ 50 kgf*cm , 43 in.*lbf }

  1. Attach the 2 wire harness clamps.



6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL