Home › ENGINE ยท 3ZR-FAE › EMISSION CONTROL › PURGE VALVE

PURGE VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PURGE VSV


    A209085
  1. Install the purge VSV with the screw.

    Torque:
    3.4 N*m{ 35 kgf*cm , 30 in.*lbf }



    A209084
  1. Connect the 2 fuel vapor feed hoses to the purge VSV.

  1. Connect the purge VSV connector.



2. INSTALL NO. 2 CYLINDER HEAD COVER


    A209050
  1. Attach the 4 clips to install the cover.

    NOTICE:
    1. Be sure to attach the clips securely.
    2. Do not apply excessive force or do not hit the cover to attach the clips. This may cause the cover to break.