Home › Power Source / Network › 2AR-FE BATTERY / CHARGING › GENERATOR
RM30B0U _57 Power Source / Network _009269 2AR-FE BATTERY / CHARGING _0054866 GENERATOR A

2AR-FE BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 1.INSTALL GENERATOR ASSEMBLY

a.

Install the generator assembly with the 2 bolts.

Torque:
52 N*m (530 kgf*cm, 38 ft.*lbf)


b.

Install the wire harness clamp bracket with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


c.

Connect the generator wire with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


d.

Install the terminal cap.


e.

Connect the generator connector.


Hide 2.INSTALL WIRE HARNESS CLAMP BRACKET

a.

Install the wire harness clamp bracket with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Attach the wire harness clamp to the wire harness clamp bracket.


Hide 4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION