1.INSTALL TRANSMISSION OIL COOLER
Install the transmission oil cooler to the front engine mounting bracket with the 2 bolts.
| *a | Red Paint Mark |
| *b | White Paint Mark |
| *c | Yellow Paint Mark |
Install the No. 8 water by-pass hose and No. 9 water by-pass hose, and slide the clips to secure it.
Make sure the paint marks are aligned as shown in the illustration.
Make sure that the claws marked A in the illustration are facing toward the top of the vehicle.
Make sure that the claws marked B in the illustration are facing toward the LH of the vehicle.
Make sure that the claws marked C in the illustration are facing toward the front end of the vehicle.
Make sure that the claws marked D in the illustration are facing toward the underside of the vehicle.
Attach the 3 clamp to the No. 8 water by-pass hose and No. 9 water by-pass hose.
| *a | Pink Paint Mark |
| *b | Yellow Paint Mark |
| *c | White Paint Mark |
Install the oil cooler inlet hose and oil cooler outlet hose, and slide the clips to secure it.
Make sure the paint marks are aligned as shown in the illustration.
Make sure that the claws marked A in the illustration are facing toward the front end of the vehicle.
Position the claws of the clips so that they do not interfere with other parts unless otherwise specified.
2.INSTALL BATTERY BRACKET REINFORCEMENT
3.INSTALL FRONT BATTERY BRACKET
4.INSTALL BATTERY TRAY
5.INSTALL BATTERY
6.INSTALL BATTERY INSULATOR
7.INSTALL BATTERY CLAMP SUB-ASSEMBLY
8.CONNECT CABLE TO POSITIVE BATTERY TERMINAL
9.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
10.ADD AUTOMATIC TRANSAXLE FLUID
11.ADD ENGINE COOLANT
12.INSPECT FOR COOLANT LEAK
13.ADJUST AUTOMATIC TRANSAXLE FLUID