Home › Engine / Hybrid System › 2AD-FTV COOLING › THERMOSTAT
RM3090E _51 Engine / Hybrid System _008373 2AD-FTV COOLING _0046725 THERMOSTAT A

2AD-FTV COOLING  THERMOSTAT  INSTALLATION  


PROCEDURE

Hide 16331A 1.INSTALL THERMOSTAT

a.

Install a new gasket to the thermostat.


b.
A297533C01
1.677,0.948 2,0.813 2,0.813 2.177,0.813 true 2.219,0.708 2.531,0.865 0.313,0.156 10 *1 1.177,0.365 1.635,0.563 0.458,0.198 10 10° 1.844,0.354 2.302,0.552 0.458,0.198 10 10°
*1 Jiggle Valve


Install the thermostat with the jiggle valve facing upward.

HINT:

The jiggle valve may be set to within 10° on either side of the prescribed position.



Hide 16321 2.INSTALL WATER INLET

a.

Install the water inlet with the 3 bolts.

Torque:
11 N*m (112 kgf*cm, 8 ft.*lbf)


Hide 16288 3.INSTALL NO. 4 WATER BY-PASS PIPE

a.
A116609

Apply soapy water to a new O-ring and install it to the No. 4 water by-pass pipe.


b.

Install the No. 4 water by-pass pipe with the bolt.

Torque:
11 N*m (112 kgf*cm, 8 ft.*lbf)


Hide 16264D 5.INSTALL NO. 2 WATER BY-PASS HOSE

a.
A295985C01
3.052,1.177 3.375,1.448 0.323,0.271 10 false 90° 0.448,1.24 0.76,1.396 0.313,0.156 10 false *a 0.125,1.667 0.438,1.823 0.313,0.156 10 false *b 2.438,1.448 2.75,1.604 0.313,0.156 10 false *c 2.729,1.063 3.042,1.219 0.313,0.156 10 false *a 0.719,1.531 1.042,1.802 0.323,0.271 10 false 180°
*a Top
*b RH Side
*c Rear Side


Install the No. 2 water by-pass hose to the No. 4 water by-pass pipe and radiator reservoir assembly, slide the 2 clamps to secure it.

HINT:

The direction of the hose clamp is indicated in the illustration.



Hide 51441 8.INSTALL NO. 1 ENGINE UNDER COVER