STEERING GEAR / LINKAGE  STEERING GEAR  INSPECTION  


PROCEDURE

Hide 45047 1.INSPECT TIE ROD END SUB-ASSEMBLY LH

a.
C132329

Secure the tie rod end between aluminum plates in a vise.

NOTICE:

Do not overtighten the vise.



b.

Install the nut to the stud bolt.


c.

Flip the ball joint back and forth 5 times.


d.

Set a torque wrench on the nut, turn the ball joint continuously at a rate of 3 to 5 seconds per turn, and check the turning torque on the 5th turn.

Standard turning torque:

0.98 to 3.92 N*m (10.0 to 39.9 kgf*cm, 8.68 to 34.6 in.*lbf)


If the turning torque is not within the specified range, replace the tie rod end sub-assembly LH with a new one.


Hide 45046 2.INSPECT TIE ROD END SUB-ASSEMBLY RH

HINT:

Use the same procedure described for the LH side.


Hide 3.INSPECT TOTAL PRELOAD

a.

Inspect the total pleload in a no-load condition by removing the tie rod end sub-assemblies RH and LH, and steering rack boots.


b.
C308147N01
2.083,0.604 2.521,0.792 true 1.802,0.5 2.26,0.698 0.458,0.198 10 false SST

Install SST to the pinion shaft and turn it left and right 5 times or more.

SST
09616-00011  


c.

Using a torque wrench and SST, turn the pinion shaft continuously at a rate of 4 to 6 seconds per turn to inspect the total preload of the steering gear assembly.

NOTICE:

Perform the inspection with the steering rack centered.


Total preload:

0.4 to 2.0 N*m (5 to 20 kgf*cm, 4 to 17 in.*lbf)


If the total preload is not within the specified range, replace the steering gear assembly with a new one.