Home › Engine / Hybrid System › 2AR-FE EMISSION CONTROL › CANISTER(w/ Canister Pump Module)
RM3090E _51 Engine / Hybrid System _008398 2AR-FE EMISSION CONTROL _0055002 CANISTER(w/ Canister Pump Module) G

2AR-FE EMISSION CONTROL  CANISTER(w/ Canister Pump Module)  INSPECTION  


PROCEDURE

Hide 77740 1.INSPECT CHARCOAL CANISTER ASSEMBLY

a.
A263351

Visually check the charcoal canister assembly for cracks or damage.

If cracks or damage is found, replace the charcoal canister assembly.


b.
A300558
1.031,1.823 1.302,1.823 1.302,1.823 1.698,1.531 true 2.719,1.823 2.719,1.604 2.719,1.604 2.833,1.51 true 0.927,0.135 1.146,0.135 1.146,0.135 2.115,1.156 true 2.604,1.271 2.99,0.698 2.99,0.698 3.125,0.698 true 0.854,1.75 1.052,1.906 0.198,0.156 10 false *1 2.635,1.833 2.948,1.99 0.313,0.156 10 false *2 0.75,0.063 1.063,0.219 0.313,0.156 10 false *3 3.167,0.615 3.396,0.781 0.229,0.167 10 false *4
*1 Vent Line Port
*2 Air Inlet Line Port
*3 Purge Line Port
*4 Connector
V100135

Air


Check the canister operation.

i.

With the purge line port and connector closed, blow air at 5 kPa (0.1 kgf/cm2, 0.7 psi) into the vent line port and check that air flows from the air inlet line port.


ii.
A300559
0.396,1.49 1.5,1.49 true 2.458,1.885 2.458,1.698 2.458,1.698 2.667,1.5 true 2.052,1.208 2.354,0.219 2.354,0.219 2.594,0.219 true 2.448,1.24 2.76,0.615 2.76,0.615 2.927,0.615 true 0.229,1.417 0.542,1.573 0.313,0.156 10 false *1 2.375,1.906 2.688,2.063 0.313,0.156 10 false *2 2.625,0.146 2.938,0.302 0.313,0.156 10 false *3 2.958,0.542 3.271,0.698 0.313,0.156 10 false *4
*1 Vent Line Port
*2 Air Inlet Line Port
*3 Purge Line Port
*4 Connector
V100135

Air


With the vent line port and connector closed, blow air at 5 kPa (0.1 kgf/cm2, 0.7 psi) into the air inlet line port and check that air flows from the purge line port.

If the result is not as specified, replace the charcoal canister assembly.



c.

Check for air leaks.

i.
A302250
2.344,2.302 2.594,2.063 2.594,2.063 2.854,2.063 false 0.5,1.417 1.563,1.417 true 2.417,1.729 2.573,1.729 2.573,1.729 2.74,1.427 true 0.281,0.135 0.458,0.135 0.458,0.135 2.094,1.115 true 2.531,1.167 2.781,0.333 2.781,0.333 3.094,0.333 true 2.896,1.99 3.208,2.146 0.313,0.156 10 false *1 0.323,1.333 0.635,1.49 0.313,0.156 10 false *2 2.25,1.656 2.563,1.813 0.313,0.156 10 false *3 0.083,0.052 0.396,0.208 0.313,0.156 10 false *4 3.125,0.26 3.344,0.427 0.219,0.167 10 false *5
*1 Pressure Gauge
*2 Vent Line Port
*3 Air Inlet Line Port
*4 Purge Line Port
*5 Connector


Connect a pressure gauge to the vent port of the canister.


ii.

With the purge line port, air inlet line port and connector closed, apply pressurized air at 19.6 kPa (0.2 kgf/cm2, 2.8 psi) into the vent line port, and then confirm that pressure is retained for 1 minute.

If the result is not as specified, replace the charcoal canister assembly.