The parking brake ECU assembly is supplied with power to operate the motor via the +B and +B2 terminals.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | Memory | Note |
|---|---|---|---|---|---|
| C13AD | Open in +B Circuit | Both of following conditions are met:
1.
Power switch on (IG) or electric parking brake switch (integration control and panel assembly) pulled to lock side with power witch off. 2.
Motor +B voltage is Mid when the parking brake motor is not operating or motor +B voltage is Lo when the parking brake motor is operating for approximately 0.5 seconds or more.
|
·
Wire harness or connector ·
Parking brake ECU assembly |
Yes | An electric parking brake system malfunction is displayed on the multi-information display. |
| Vehicle Condition | |||||
| Pattern 1 | Pattern 2 | Pattern 3 | Pattern 4 | ||
| Diagnosis Condition | Electric parking brake switch (integration control and panel assembly) is operated to lock side with power switch off | ○ | ○ | - | - |
| Power switch on (IG) | - | - | ○ | ○ | |
| Malfunction Status | Motor +B voltage is Mid when parking brake motor is not operating | ○ | - | ○ | - |
| Motor +B voltage is Lo when parking brake motor is operating | - | ○ | - | ○ | |
| Detection Time | Approximately 0.5 seconds | Approximately 0.5 seconds | Approximately 0.5 seconds | Approximately 0.5 seconds | |
| Trip Count | 1 trip | 1 trip | 1 trip | 1 trip | |
If the conditions match either of these patterns, a DTC will be output.
| *a | Parking Brake Motor Not Operating | *b | Parking Brake Motor Operating |
| *c | Auxiliary Battery Voltage (V) | *d | +B and +B2 Terminal Voltage (V) |
| *e | Normal Range | *f | DTC Detection Range |
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
The electric parking brake may still operate up to 20 seconds after the power switch is turned off. Before disconnecting connectors or fuses, turn the power switch off and wait 20 seconds or more.
When replacing the parking brake ECU assembly, operate the electric parking brake switch (integration control and panel assembly) from the lock side to the release side, as the parking brake indicator light blinks when the power switch is first turned on (IG).
Turn the power switch off.
Connect the GTS to the DLC3.
Turn the power switch on (IG) and the GTS on.
Enter the following menus: Chassis / Electric Parking Brake / Data List.
Check the Data List.
| Tester Display | Measurement Item | Range | Normal Condition |
|---|---|---|---|
| RH Motor +B Voltage | Parking brake motor RH (parking brake actuator assembly RH) +B voltage display | Lo, Mid, Error or Hi | Hi |
| LH Motor +B Voltage | Parking brake motor LH (parking brake actuator assembly LH) +B voltage display | Lo, Mid, Error or Hi | Hi |
| Tester Display |
|---|
| RH Motor +B Voltage |
| LH Motor +B Voltage |
| Proceed to |
|---|
| OK |
| NG |
OK
Click hereGeneral>INTRODUCTION>HOW TO TROUBLESHOOT ECU CONTROLLED SYSTEMS>HOW TO PROCEED WITH TROUBLESHOOTING
NG
Turn the power switch off.
| *a | Front view of wire harness connector
(to Parking Brake ECU Assembly) |
Disconnect the parking brake ECU assembly connector.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| M36-7 (+B) - Body ground | Always | 11 to 14 V |
| M36-12 (+B2) - Body ground | Always | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG