Home › Drivetrain ยท DRIVE SHAFT / PROPELLER SHAFT › REAR DRIVE SHAFT ASSEMBLY

REAR DRIVE SHAFT ASSEMBLY > INSTALLATION

for Preparation Click here



1. INSTALL REAR DRIVE SHAFT ASSEMBLY
  1. Coat the spline of the inboard joint shaft assembly with gear oil.



    C179279
  1. Align the shaft splines and install the drive shaft with a brass bar and hammer.

    NOTICE:
    Be careful not to damage the differential oil seal, inboard joint boot and drive shaft dust cover.

    HINT:
    1. Set the inboard joint shaft snap ring with the opening side facing downward.
    2. Whether the inboard joint shaft is in contact with the pinion shaft or not can be confirmed from the sound or feeling when driving it.



2. INSTALL REAR AXLE CARRIER ASSEMBLY
  1. Install the rear axle carrier assembly (Click here).



3. ADD REAR DIFFERENTIAL OIL


    D025304E27
  1. Add differential oil so that the oil level is between 0 to 5 mm (0 to 0.197 in.) from the bottom lip of the differential filler plug hole.

    NOTICE:
    1. Too much or too little oil will lead to differential problems.
    2. After changing the oil, drive the vehicle and then check the oil level again.

    Oil Type:
    Item
    Oil Type and Viscosity
    Front differential
    Toyota Genuine Differential gear oil LT 75W-85 GL-5 or equivalent.
    Rear differential

    Front Differential Capacity:
    Specified Condition
    2.05 to 2.15 liters (2.2 to 2.3 US qts., 1.8 to 1.9 Imp. qts.)

    Rear Differential Capacity:
    Specified Condition
    1.50 to 1.60 liters (1.6 to 1.7 US qts., 1.3 to 1.4 Imp. qts.)

  1. for Rear Differential:

    1. Using a 10 mm hexagon wrench, install a new gasket and the filler plug.

      Torque:
      39 N*m{ 400 kgf*cm , 29 ft.*lbf }

  1. for Front Differential:

    1. Using a 10 mm hexagon wrench, install a new gasket and the filler plug.

      Torque:
      39 N*m{ 400 kgf*cm , 29 ft.*lbf }



4. INSPECT FOR REAR DIFFERENTIAL OIL LEAK