Home › Power Source / Network · 2UZ-FE BATTERY / CHARGING › GENERATOR

GENERATOR > INSPECTION

for Preparation Click here



1. INSPECT GENERATOR ROTOR ASSEMBLY


    A117220
  1. Check the rotor for an open circuit.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      Slip ring - Slip ring
      20°C (68°F)
      2.3 to 2.7 Ω (130A Type)
      1.5 to 1.9 Ω (150A Type)

      If the result is not as specified, replace the rotor assembly.



    A117221
  1. Check if the rotor is grounded.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      Slip ring - Rotor
      Always
      10 kΩ or higher

      If the result is not as specified, replace the rotor assembly.

  1. Check that the slip rings are not rough or scored.
    If rough or scored, replace the rotor assembly.



    A117222E01
  1. Using a vernier caliper, measure the slip ring diameter.

    Standard diameter:
    14.2 to 14.4 mm (0.559 to 0.567 in.)

    Minimum diameter:
    14.0 mm (0.551 in.)

    If the diameter is less than the minimum, replace the rotor assembly.



2. INSPECT GENERATOR BRUSH HOLDER ASSEMBLY


A079305E06
  1. Using a vernier caliper, measure the exposed brush length.

    Standard exposed length:
    10.5 mm (0.413 in.)

    Minimum exposed length:
    4.5 mm (0.177 in.)

    If the exposed length is less than the minimum, replace the brush holder assembly.



3. INSPECT GENERATOR DRIVE END FRAME BEARING


    A163048
  1. When rotating the bearing, check that there is no abnormal noise and that it rotates smoothly.
    If necessary, replace the bearing.



4. INSPECT GENERATOR ROTOR BEARING
  1. When rotating the bearing, check that there is no abnormal noise and that it rotates smoothly.
    If necessary, replace the generator rotor.