Home › Engine / Hybrid System ยท 2UZ-FE › ENGINE CONTROL › THROTTLE BODY

THROTTLE BODY > INSTALLATION

for Preparation Click here



1. INSTALL THROTTLE BODY ASSEMBLY


    A158395
  1. Install a new gasket and the throttle body assembly with the 3 bolts and nut.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. Connect the throttle body assembly connector.



    A158396
  1. Connect the 2 water by-pass hoses.



2. INSTALL AIR CLEANER HOSE ASSEMBLY


    A153488E02
  1. Install the air cleaner hose assembly with the 2 clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    HINT:
    Make sure that the clamp band end is aligned with the limit mark when the hose clamp is tightened, as indicated by A and B in the illustration.

  1. Connect the vacuum hose and No. 2 ventilation hose.



3. ADD ENGINE COOLANT
  1. Add engine coolant.

    Standard capacity:
    9.7 liters (10.3 US qts, 8.5 Imp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology is a combination of low phosphates and organic acids).
    2. The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.



    A151850E03
  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Install the reservoir cap.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Install the radiator cap.

  1. Start the engine and warm it up until the thermostat opens.

    HINT:
    The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. Maintain the engine speed at 2000 to 2500 rpm and warm up the engine until the cooling fan operates.

    NOTICE:
    1. Make sure that the radiator reservoir still has some coolant in it.
    2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    3. If there is not enough coolant, the engine may burn out or overheat.

  1. Press the inlet and outlet radiator hoses several times by hand to bleed air.

    CAUTION:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the fan.

  1. Stop the engine, and wait until the engine coolant cools down.



    A151850E04
  1. If the coolant level is below the LOW line, repeat all of the procedures above.



4. INSPECT FOR ENGINE COOLANT LEAK

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A162054
  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop. If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.



5. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY


    A153486
  1. Install the throttle body cover sub-assembly with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



6. PERFORM INITIALIZATION

NOTICE:
  1. Be sure to perform this procedure after reassembling the throttle body assembly or removing and reinstalling any throttle body component.
  2. Be sure to perform this procedure after reconnecting the battery cable and replacing the ECM.

  1. Disconnect the EFI fuse and ETCS fuse the same time. Wait at least 60 seconds and reconnect the fuses.

  1. Turn the ignition switch to ON without operating the accelerator pedal.

    NOTICE:
    If the accelerator pedal is operated, perform the above steps again.

  1. Connect the Techstream to the DLC3 and clear the DTCs (Click here ).

  1. Start the engine and check that the MIL is not illuminated and that the idle speed is within the specified range when the A/C is switched off after the engine is warmed up.

    Standard:
    Condition
    Engine Idle Speed
    A/C switched off
    650 to 750 rpm

    NOTICE:
    1. Be sure to perform this step with all accessories off.
    2. Make sure that the shift lever is in N or P.

  1. Enter the following menus: Powertrain/ Engine/ Data List/ Throttle Position. Sensor Output. Fully depress the accelerator pedal and check that the value is 60% or more.

  1. Perform a road test and confirm that there are no abnormalities.