Home › Engine / Hybrid System ยท 2UZ-FE › EMISSION CONTROL › AIR SWITCHING VALVE

AIR SWITCHING VALVE > REMOVAL

for Preparation Click here



1. REMOVE FRONT FENDER APRON SEAL LH


    A159336
  1. Remove the 5 clips and front fender apron seal LH.



2. REMOVE NO. 2 AIR HOSE


    A153515
  1. Disconnect the air switching valve assembly connector.

  1. Disconnect the fuel hose clamp.



    A153516
  1. Remove the No. 2 air hose.



3. REMOVE NO. 3 AIR TUBE


A153518
  1. Remove the 4 nuts, No. 3 air tube and 2 gaskets.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.



4. REMOVE AIR SWITCHING VALVE ASSEMBLY (for Bank 1)


A153519E01
  1. Remove the 3 nuts and air switching valve assembly.

    NOTICE:
    Do not hold the bracket of the air switching valve assembly.



5. REMOVE FRONT FENDER APRON SEAL RH


    A159335
  1. Remove the 5 clips and front fender apron seal RH.



6. REMOVE NO. 1 WATER BY-PASS PIPE


    A159337
  1. Remove the 2 bolts and disconnect the No. 1 water by-pass pipe.

    NOTICE:
    Do not disconnect the hoses. If it is necessary to disconnect the hoses, first drain the engine coolant.



7. DISCONNECT NO. 2 AIR INJECTION SYSTEM HOSE
  1. Disconnect the No. 2 air injection system hose from the air switching valve assembly.



8. REMOVE NO. 2 AIR TUBE


    A153510
  1. Disconnect the air switching valve assembly connector.

  1. Disconnect the wire harness clamp.



    A153512
  1. Remove the 4 nuts, No. 2 air tube and 2 gaskets.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.



9. REMOVE AIR SWITCHING VALVE ASSEMBLY (for Bank 2)


    A153513E01
  1. Remove the 3 nuts and air switching valve assembly.

    NOTICE:
    Do not hold the bracket of the air switching valve assembly.