Home › Engine / Hybrid System ยท 2UZ-FE › ENGINE MECHANICAL › DRIVE BELT

DRIVE BELT > REMOVAL

for Preparation Click here



1. REMOVE THROTTLE BODY COVER SUB-ASSEMBLY


    A153486
  1. Remove the 2 nuts and throttle body cover sub-assembly.



2. REMOVE AIR CLEANER HOSE ASSEMBLY


    A153487
  1. Disconnect the vacuum hose and No. 2 ventilation hose.

  1. Loosen the 2 hose clamps and remove the air cleaner hose assembly.



3. REMOVE NO. 1 ENGINE UNDER COVER


    A150108
  1. Remove the 3 screws and 5 bolts.

  1. Unhook the engine under cover from the vehicle body as shown in the illustration.



4. REMOVE FAN AND GENERATOR V BELT


    B000809E02
  1. Loosen the belt tension by turning the belt tensioner counterclockwise, and then remove the fan and generator V belt.

    HINT:
    The pulley bolt for the belt tensioner has left-hand thread.