Home › Engine / Hybrid System ยท 2UZ-FE › ENGINE CONTROL › CAMSHAFT OIL CONTROL VALVE

CAMSHAFT OIL CONTROL VALVE > INSTALLATION

for Preparation Click here



1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)


    A185612
  1. Install a new O-ring to the camshaft timing oil control valve assembly.

  1. Apply a light coat of engine oil to the O-ring.

  1. Install the camshaft timing oil control valve assembly with the bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the camshaft timing oil control valve assembly connector.



2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)


    A185611
  1. Install a new O-ring to the camshaft timing oil control valve assembly.

  1. Apply a light coat of engine oil to the O-ring.

  1. Install the camshaft timing oil control valve assembly with the bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the camshaft timing oil control valve assembly connector.



3. INSTALL AIR CLEANER HOSE ASSEMBLY


    A153488E02
  1. Install the air cleaner hose assembly with the 2 clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    HINT:
    Make sure that the clamp band end is aligned with the limit mark when the hose clamp is tightened, as indicated by A and B in the illustration.

  1. Connect the vacuum hose and No. 2 ventilation hose.



4. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY


    A153486
  1. Install the throttle body cover sub-assembly with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }