Home › Steering › STEERING GEAR / LINKAGE › STEERING GEAR

STEERING GEAR > INSPECTION

for Preparation Click here



1. INSPECT TIE ROD END SUB-ASSEMBLY LH


C132329
  1. Secure the tie rod end LH in a vise.

  1. Install the nut to the stud bolt.

  1. Flip the ball joint back and forth 5 times or more.

  1. Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and take the torque reading on the fifth turn.

    Standard turning torque:
    1.0 to 3.9 N*m (10 to 40 kgf*cm, 9 to 34 in.*lbf)

    If turning torque is not within the specified range, replace the tie rod end LH.



2. INSPECT TIE ROD END SUB-ASSEMBLY RH

HINT:
Use the same procedure for both sides.



3. INSPECT TOTAL PRELOAD
  1. Temporarily install the 2 steering rack ends to the power steering rack.

    NOTICE:
    Do not fully turn the power steering rack without the steering rack ends as it may damage the oil seal in the rack housing.



    C160280E01
  1. Using SST, fully turn the power steering rack right and left 10 times to settle it.

    SST
    09616-00011  



    C160281E01
  1. Using SST, turn the control valve and measure the preload.

    SST
    09616-00011  

    Standard preload (turning):
    1.5 N*m (15 kgf*cm, 13 in.*lbf) or less

    If the turning torque is not as specified, replace the power steering gear assembly.