IGNITION COIL AND SPARK PLUG > REMOVAL |
| 1. REMOVE THROTTLE BODY COVER ASSEMBLY |
![]() |
Remove the 2 nuts and throttle body cover sub-assembly.
| 2. REMOVE AIR CLEANER HOSE ASSEMBLY |
![]() |
Disconnect the vacuum hose and No. 2 ventilation hose.
Loosen the 2 hose clamps and remove the air cleaner hose assembly.
| 3. REMOVE FRONT FENDER APRON SEAL LH |
![]() |
Remove the 5 clips and front fender apron seal LH.
| 4. REMOVE NO. 2 AIR HOSE |
![]() |
Disconnect the air switching valve assembly connector.
Disconnect the fuel hose clamp.
![]() |
Remove the No. 2 air hose.
| 5. REMOVE NO. 3 AIR TUBE |
![]() |
Remove the 4 nuts, No. 3 air tube and 2 gaskets.
| 6. REMOVE AIR SWITCHING VALVE ASSEMBLY (for Bank 1) |
![]() |
Remove the 3 nuts and air switching valve assembly.
| 7. REMOVE FRONT FENDER APRON SEAL RH |
![]() |
Remove the 5 clips and front fender apron seal RH.
| 8. DISCONNECT NO. 1 WATER BY-PASS PIPE |
![]() |
Remove the 2 bolts and disconnect the No. 1 water by-pass pipe.
| 9. DISCONNECT NO. 2 AIR INJECTION SYSTEM HOSE |
Disconnect the No. 2 air injection system hose from the air switching valve assembly.
| 10. REMOVE NO. 2 AIR TUBE |
![]() |
Disconnect the air switching valve assembly connector.
Disconnect the wire harness clamp.
![]() |
Remove the 4 nuts, No. 2 air tube and 2 gaskets.
| 11. REMOVE AIR SWITCHING VALVE ASSEMBLY (for Bank 2) |
![]() |
Remove the 3 nuts and air switching valve assembly.
| 12. REMOVE IGNITION COIL ASSEMBLY |
![]() |
Disconnect the 8 ignition coil assembly connectors.
Remove the 8 bolts and pull out the 8 ignition coil assemblies.
| 13. REMOVE SPARK PLUG |
Using a 16 mm plug wrench, remove the 8 spark plugs.