Home › Engine / Hybrid System ยท 2UZ-FE › EMISSION CONTROL › PURGE VALVE

PURGE VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PURGE VSV


A153521
  1. Install the purge VSV with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the 2 purge line hoses.

  1. Connect the purge VSV connector.