Home › Drivetrain · AB60E AUTOMATIC TRANSMISSION / TRANSAXLE › SHIFT LEVER

SHIFT LEVER > INSPECTION

for Preparation Click here



1. INSPECT SHIFT LOCK CONTROL ECU


    C113154E09
  1. Measure the voltage according to the values in the table below.

    HINT:
    Do not disconnect the shift lock control ECU connector.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    12 (IG) - 3 (E)
    Ignition switch ON
    11 to 14 V
    12 (IG) - 3 (E)
    Ignition switch off
    Below 1 V
    6 (STP) - 3 (E)
    Depress brake pedal
    11 to 14 V
    6 (STP) - 3 (E)
    Release brake pedal
    Below 1 V

    If the result is not as specified, replace the shift lock control ECU.

  1. Measure the resistance according to the value(s) in the table below.

    HINT:
    Do not disconnect the shift lock control ECU connector.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    3 (E) - Body ground
    When battery voltage not applied
    Below 1 Ω

    If the result is not as specified, replace the shift lock control ECU.



    C172429E01
  1. Disconnect the shift lock solenoid connector from the shift lock control ECU.

  1. Measure the voltage according to the values in the table below.

    HINT:
    Do not disconnect the shift lock control ECU connector.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    1 (SLS+) - 2 (SLS-)
    Ignition switch off
    Below 1 V
    1 (SLS+) - 2 (SLS-)
    Ignition switch ON
    Below 1 V
    1 (SLS+) - 2 (SLS-)
    Ignition switch ON and brake pedal depressed
    11 to 14 V

    If the result is not as specified, replace the shift lock control ECU.



2. INSPECT SHIFT LOCK SOLENOID


    C150404E07
  1. Disconnect the shift lock solenoid connector from the shift lock control ECU.

  1. Measure the resistance according to the values in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 (SLS+) - 2 (SLS-)
    When battery voltage not applied
    101 to 123 Ω
    3 (E2) - 4 (P)
    Shift position P
    10 kΩ or higher
    3 (E2) - 4 (P)
    Shift position not P
    Below 1 Ω

    If the result is not as specified, replace the transmission floor shift assembly.

  1. Apply 12 V battery voltage to the shift lock solenoid valve and check that the valve moves and makes an operating noise.

    OK:
    Measurement Condition
    Specified Condition
    Battery positive (+) → Terminal 1 (SLS+)
    Battery negative (-) → Terminal 2 (SLS-)
    Solenoid moves and makes an operating noise

    If the result is not as specified, replace the transmission floor shift assembly.



3. INSPECT TRANSMISSION CONTROL SWITCH


    C146679E07
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    3 (IG) - 7 (S)
    Shift position S
    Below 1 Ω
    3 (IG) - 7 (S)
    Shift position not S
    10 kΩ or higher
    2 (SFTU) - 5 (E)
    Shift lever continuously shifted to "+" position (Up-shift)
    Below 1 Ω
    2 (SFTU) - 5 (E)
    Shift position S
    10 kΩ or higher
    1 (SFTD) - 5 (E)
    Shift lever continuously shifted to "-" position (Down-shift)
    Below 1 Ω
    1 (SFTD) - 5 (E)
    Shift position S
    10 kΩ or higher

    If the result is not as specified, replace the transmission floor shift assembly.