Home › Engine / Hybrid System · 3UR-FBE › EMISSION CONTROL › AIR SWITCHING VALVE

AIR SWITCHING VALVE > INSPECTION

for Preparation Click here



1. INSPECT AIR SWITCHING VALVE ASSEMBLY


    A158642
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 5
    20°C (68°F)*
    4.5 to 5.5 Ω
    1 - Body ground
    Always
    1 MΩ or higher
    5 - Body ground

    HINT:
    *: Make sure that the air switching valve is at ambient temperature before measuring the resistance.

    NOTICE:
    When applying voltage, do not touch terminals 2, 3 and 4.

    If the result is not as specified, replace the air switching valve assembly.



    A158643E01
  1. Check the operation of the air switching valve assembly.

    1. Check that air does not flow from port A to port B.

      NOTICE:
      Make sure that the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less

      If the result is not as specified, replace the air switching valve assembly.



    2. A158644E01
    3. Apply battery voltage to the connector, and check the air switching valve operation.

      NOTICE:
      When applying voltage, do not touch terminals 2, 3 and 4.

      OK:
      Measurement Condition
      Specified Condition
      Battery positive (+) → Terminal 1
      Battery negative (-) → Terminal 5
      Air flows from port A to port B

      If the result is not as specified, replace the air switching valve assembly.