Home › Engine / Hybrid System ยท 3UR-FE › ENGINE CONTROL › CAMSHAFT OIL CONTROL VALVE

CAMSHAFT OIL CONTROL VALVE > INSTALLATION

for Preparation Click here



1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)


A163109
  1. Install a new O-ring to the oil control valve.

  1. Apply a light coat of engine oil to the O-ring.

  1. Install the oil control valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the oil control valve connector.



2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)


A163110
  1. Install a new O-ring to the oil control valve.

  1. Apply a light coat of engine oil to the O-ring.

  1. Install the oil control valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the oil control valve connector.



3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)


A163111
  1. Install a new O-ring to the oil control valve.

  1. Apply a light coat of engine oil to the O-ring.

  1. Install the oil control valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the oil control valve connector.



4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)


A163112
  1. Install a new O-ring to the oil control valve.

  1. Apply a light coat of engine oil to the O-ring.

  1. Install the oil control valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the oil control valve connector.



5. INSTALL AIR CLEANER HOSE ASSEMBLY


A187008
  1. Install the air cleaner hose with the 2 clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. Connect the vacuum hose.

  1. Connect the ventilation hose.



6. INSTALL V-BANK COVER SUB-ASSEMBLY


A165576E03
  1. Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover to attach the pins.