Home › Engine / Hybrid System · 3UR-FBE › STARTING › RELAY

RELAY > ON-VEHICLE INSPECTION

for Preparation Click here



1. INSPECT STARTER RELAY (ST)


    B060778E26
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    3 - 5
    Battery voltage not applied to terminals 1 and 2
    10 kΩ or higher
    Battery voltage applied to terminals 1 and 2
    Below 1 Ω

    If the result is not as specified, replace the relay.



2. INSPECT STARTER CUT RELAY (ST CUT)


    B060778E26
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    3 - 5
    Battery voltage not applied to terminals 1 and 2
    10 kΩ or higher
    Battery voltage applied to terminals 1 and 2
    Below 1 Ω

    If the result is not as specified, replace the relay.



3. INSPECT MAIN BODY ECU (ACC RELAY)



A160907E01

  1. Measure the resistance of the ACC relay circuit.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      DD-47 - DD-8
      Battery voltage not applied between DD-45 and DD-62
      10 kΩ or higher
      Battery voltage applied between DD-45 and DD-62
      Below 1 Ω

      If the result is not as specified, replace the main body ECU.