Home › Drivetrain · AB60E AUTOMATIC TRANSMISSION / TRANSAXLE › VALVE BODY ASSEMBLY

VALVE BODY ASSEMBLY > INSPECTION

for Preparation Click here



1. INSPECT SHIFT SOLENOID VALVE SL1


    C151311E15
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    5.0 to 5.6 Ω

  1. Connect the battery positive (+) lead with a 21 W bulb to terminal 1 and the negative (-) lead to terminal 2 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.

    NOTICE:
    Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.

    OK:
    Valve moves and makes operating noise.

    If the result is not as specified, replace the solenoid valve.



2. INSPECT SHIFT SOLENOID VALVE S1


    C160563E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    Shift solenoid valve S1 connector terminal - Shift solenoid valve S1 body
    20°C (68°F)
    11 to 15 Ω

  1. Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.

    OK:
    Valve moves and makes operating noise.

    If the result is not as specified, replace the solenoid valve.



3. INSPECT SHIFT SOLENOID VALVE S2


    C160564E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    Shift solenoid valve S2 connector terminal - Shift solenoid valve S2 body
    20°C (68°F)
    11 to 15 Ω

  1. Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.

    OK:
    Valve moves and makes operating noise.

    If the result is not as specified, replace the solenoid valve.



4. INSPECT SHIFT SOLENOID VALVE S3


    C160563E02
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    Shift solenoid valve S3 connector terminal - Shift solenoid valve S3 body
    20°C (68°F)
    11 to 15 Ω

  1. Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.

    OK:
    Valve moves and makes an operating noise.

    If the result is not as specified, replace the solenoid valve.



5. INSPECT SHIFT SOLENOID VALVE S4


    C123198E03
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    Shift solenoid valve S4 connector terminal - Shift solenoid valve S4 body
    20°C (68°F)
    11 to 15 Ω

  1. Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.

    OK:
    Valve moves and makes an operating noise.

    If the result is not as specified, replace the solenoid valve.



6. INSPECT SHIFT SOLENOID VALVE SL2


    C151311E13
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    5.0 to 5.6 Ω

  1. Connect the battery positive (+) lead with a 21 W bulb to terminal 1 and the negative (-) lead to terminal 2 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.

    NOTICE:
    Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.

    OK:
    Valve moves and makes an operating noise.

    If the result is not as specified, replace the solenoid valve.



7. INSPECT SHIFT SOLENOID VALVE SR


    C160565E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    Shift solenoid valve SR connector terminal - Shift solenoid valve SR body
    20°C (68°F)
    11 to 15 Ω

  1. Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.

    OK:
    Valve moves and makes an operating noise.

    If the result is not as specified, replace the solenoid valve.



8. INSPECT SHIFT SOLENOID VALVE SLT


    C162477E03
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    5.0 to 5.6 Ω

  1. Connect the battery positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.

    NOTICE:
    Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.

    OK:
    Valve moves and makes an operating noise.

    If the result is not as specified, replace the solenoid valve.



9. INSPECT SHIFT SOLENOID VALVE SLU


    C162477E04
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    5.0 to 5.6 Ω

  1. Connect the battery positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.

    NOTICE:
    Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.

    OK:
    Valve moves and makes an operating noise.

    If the result is not as specified, replace the solenoid valve.