CANISTER > INSPECTION |
| 1. INSPECT CHARCOAL CANISTER ASSEMBLY |
![]() |
Visually check the charcoal canister assembly for cracks or damage.
If cracks or damage are found, replace the charcoal canister assembly.
![]() |
Check for the canister operation.
With the purge port closed, blow 2 kPa (20 gf/cm2, 0.3 psi) of air into the vent port, and check that air flows from the air inlet port.
If the result is not as specified, replace the canister assembly.
![]() |
With the vent port closed, blow 1 kPa (10 gf/cm2, 0.2 psi) of air inlet port, and check that air flows from the purge port.
If the result is not as specified, replace the charcoal canister assembly.
![]() |
Check for air leak.
Remove the air hose between ports A and B.
Connect the pressure gauge to the vent port of the charcoal canister assembly.
With port B, purge port and the air inlet port closed and port A open, apply 20 kPa (0.2 kgf/cm2, 2.9 psi) of pressurized air into the vent port, and then confirm that pressure is retained for 1 minute.
If the result is not as specified, replace the charcoal canister assembly.