IGNITION COIL AND SPARK PLUG > INSTALLATION |
| 1. INSTALL SPARK PLUG |
Using a 16 mm plug wrench, install the 8 spark plugs.
| 2. INSTALL IGNITION COIL ASSEMBLY |
for Bank 1:
![]() |
Install the 4 ignition coils with the 4 bolts.
![]() |
Connect the 4 ignition coil connectors.
Connect the 3 wire harness clamps.
for Bank 2:
![]() |
Install the 4 ignition coils with the 4 bolts.
![]() |
Connect the 4 ignition coil connectors and 2 wire harness clamps.
![]() |
Connect the water by-pass pipe with the 2 bolts.
![]() |
Connect the engine wire harness clamp.
| 3. INSTALL AIR CLEANER ASSEMBLY |
![]() |
Install the air cleaner with the 2 bolts.
Tighten the hose clamp.
Connect the ventilation hose and vacuum hose.
Connect the MAF meter connector and clamp.
| 4. INSTALL V-BANK COVER SUB-ASSEMBLY |
![]() |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover to attach the pins.