Home › Engine / Hybrid System ยท 1UR-FE › ENGINE CONTROL › IGNITION COIL AND SPARK PLUG

IGNITION COIL AND SPARK PLUG > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER SUB-ASSEMBLY


    A214822E01
  1. Raise the front of the V-bank cover to detach the 2 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.



2. REMOVE AIR CLEANER ASSEMBLY


    A215422
  1. Disconnect the MAF meter connector and clamp.

  1. Disconnect the ventilation hose and vacuum hose.

  1. Loosen the hose clamp.

  1. Remove the 2 bolts and air cleaner.



3. REMOVE IGNITION COIL ASSEMBLY


  1. for Bank 1:



      A215594
    1. Disconnect the 3 wire harness clamps.

    2. Disconnect the 4 ignition coil connectors.



    3. A215593
    4. Remove the 4 bolts and 4 ignition coils.



  1. for Bank 2:



      A215596
    1. Disconnect the 2 wire harness clamps.

    2. Disconnect the 4 ignition coil connectors.



    3. A215595
    4. Disconnect the engine wire harness clamp.



    5. A216323
    6. Remove the 2 bolts and disconnect the water by-pass pipe.



    7. A215597
    8. Remove the 4 bolts and 4 ignition coils.



4. REMOVE SPARK PLUG
  1. Using a 16 mm plug wrench, remove the 8 spark plugs.