AIR SWITCHING VALVE > INSTALLATION |
| 1. INSTALL NO. 3 AIR TUBE |
![]() |
Install a new gasket and the No. 3 air tube with the 2 bolts.
| 2. INSTALL NO. 2 AIR TUBE |
![]() |
Install a new gasket and the No. 2 air tube with the 2 bolts.
| 3. INSTALL AIR SWITCHING VALVE ASSEMBLY |
![]() |
Install the air switching valve assembly with the 3 bolts.
Connect the 2 air switching valve connectors.
![]() |
Install the bracket with the bolt.
Connect the knock sensor connector.
| 4. INSTALL AIR PIPE SUB-ASSEMBLY |
Connect the 2 No. 1 air hoses to the air pipe.
![]() |
Connect the air pipe to the air switching valve assembly, and install the air pipe with the 2 bolts.
![]() |
Connect the air switching valve connector clamp holder.
Attach the wire harness claw.
Connect the air switching valve connector.
Connect the No. 2 air injection system hose and No. 3 air injection system hose.
| 5. INSTALL FRONT WATER BY-PASS JOINT |
![]() |
Install 2 new gaskets and the front water by-pass joint with the 4 nuts.
Connect the engine coolant temperature sensor connector.
| 6. CONNECT WATER BY-PASS PIPE HOSE (w/ Trailer Towing System) |
![]() |
Connect the water by-pass pipe hose with the 3 bolts.
| 7. CONNECT NO. 2 WATER BY-PASS HOSE |
![]() |
Connect the No. 2 water by-pass hose to the water by-pass joint.
| 8. CONNECT NO. 1 WATER BY-PASS HOSE |
Connect the No. 1 water by-pass hose to the water by-pass joint and water inlet housing.
| 9. INSTALL NO. 1 ENGINE COVER |
![]() |
Install the No. 1 engine cover.
| 10. CONNECT FUEL TUBE CLAMP |
![]() |
Connect the fuel tube clamp to the bracket.
| 11. INSTALL NO. 2 CYLINDER HEAD COVER |
![]() |
Install the No. 2 cylinder head cover.
| 12. INSTALL FAN SHROUD |
Install the fan shroud (Click here).
| 13. INSTALL INTAKE MANIFOLD |
Install the intake manifold (Click here).
| 14. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY |
Install the exhaust manifold (Click here).