Home › Engine / Hybrid System ยท 1UR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 1)

AIR SWITCHING VALVE (for Bank 1) > INSTALLATION

for Preparation Click here



1. INSTALL AIR SWITCHING VALVE ASSEMBLY


    A214833E01
  1. Install a new gasket and the air switching valve with the 3 bolts.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

    NOTICE:
    Make sure the gasket's claws are not caught between the air switching valve and No. 4 air tube.



    A214262
  1. Install the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A214260
  1. Connect the wire harness clamp bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



2. CONNECT NO. 2 AIR HOSE


    A214823E01
  1. Align the paint mark with the projection and connect the No. 2 air hose.

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. Connect the connector.