Home › Engine / Hybrid System ยท 3UR-FE › EMISSION CONTROL › PURGE VALVE

PURGE VALVE > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER SUB-ASSEMBLY


A165576E03
  1. Raise the front of the V-bank cover to detach the 2 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.



2. DISCONNECT PURGE LINE HOSE
  1. Disconnect the 2 purge line hoses.



3. REMOVE NO. 1 VACUUM SWITCHING VALVE ASSEMBLY


    A158599
  1. Disconnect the connector.

  1. Remove the bolt and No. 1 vacuum switching valve assembly.