Home › Engine / Hybrid System ยท 1UR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 2)

AIR SWITCHING VALVE (for Bank 2) > INSTALLATION

for Preparation Click here



1. INSTALL AIR SWITCHING VALVE ASSEMBLY


    A214834E01
  1. Install a new gasket and the air switching valve with the 3 bolts.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

    NOTICE:
    Make sure the gasket's claws are not caught between the air switching valve and No. 3 air tube.



    A214299
  1. Install the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A214255
  1. Connect the wire harness clamp bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the clamp and connector.



2. CONNECT NO. 1 AIR HOSE


    A214257E02
  1. Align the paint mark with the projection and connect the No. 1 air hose.

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.



3. CONNECT NO. 3 VENTILATION HOSE


    A214824E01
  1. Connect the No. 3 ventilation hose.

    HINT:
    The direction of the hose clamp is indicated in the illustration.



4. INSTALL AIR CLEANER HOSE ASSEMBLY


    A214569
  1. Install the air cleaner hose with the 2 clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. Connect the ventilation hose and vacuum sensing hose.



5. INSTALL V-BANK COVER SUB-ASSEMBLY


    A214821E01
  1. Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover to attach the pins.