YAW RATE AND DECELERATION SENSOR > INSTALLATION |
| 1. INSTALL YAW RATE SENSOR ASSEMBLY |

| *a | Front | *b | Arrow Stamp |
Connect the sensor connector (labeled A), and then attach the clamp (labeled B) to the hole of the sensor bracket.
Install the yaw rate sensor with the 2 nuts (labeled C).
| 2. INSTALL REAR CONSOLE BOX ASSEMBLY (w/o Cool Box) |
![]() |
Attach the 6 claws to install the rear console box.
Install the 2 screws and 4 bolts.
![]() |
Connect the connectors.
| 3. INSTALL CONSOLE BOX CARPET (w/o Cool Box) |
![]() |
Install the console box carpet.
| 4. INSTALL REAR CONSOLE BOX POCKET (w/o Cool Box) |
![]() |
Install the rear console box pocket.
| 5. INSTALL REAR CONSOLE BOX ASSEMBLY (w/ Cool Box) |
Attach the 6 claws to install the rear console box.
Install the 2 screws and 4 bolts.
Connect the 2 connectors.
| 6. INSTALL COOLING BOX ASSEMBLY (w/ Cool Box) |
Attach the 4 clips and claw and install the cooling box assembly.
Install 4 new No. 1 cool box packings.
Install the 4 bolts.
Connect the 3 connectors.
| 7. INSTALL COOLING BOX TRAY (w/ Cool Box) |
Install the cooling box tray.
| 8. CONNECT AIR CONDITIONER TUBE AND ACCESSORY ASSEMBLY (w/ Cool Box) |
Remove the attached vinyl tape from the air conditioner tube and accessory assembly.
Sufficiently apply compressor oil to 2 new O-rings and to the fitting surface of the cooling box assembly.
Install the 2 O-rings on the air conditioner tube and accessory assembly.
Connect the air conditioner tube and accessory assembly to the cooling box assembly with the 2 bolts.
| 9. INSTALL REAR UPPER CONSOLE PANEL SUB-ASSEMBLY |
![]() |
Connect the connectors.
Attach the 6 clips to install the console panel.
Install the clip.
| 10. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY |
![]() |
Attach the 12 clips to install the console panel.
| 11. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY |
![]() |
Install the shift lever knob and twist it in the direction indicated by the arrow.
| 12. CHARGE REFRIGERANT (w/ Cool Box) |

Perform vacuum purging using a vacuum pump.
Charge refrigerant HFC-134a (R134a).
| Cool Box | Refrigerant Charging Amount |
| w/ Cool Box | 1080 to 1140 g (38.1 to 40.2 oz.) |
| w/o Cool Box | 920 to 980 g (32.4 to 34.6 oz.) |

Install the caps onto the service valves on the refrigerant line.
| 13. WARM UP ENGINE (w/ Cool Box) |
| 14. INSPECT FOR REFRIGERANT LEAK (w/ Cool Box) |
After recharging the refrigerant gas, check for refrigerant gas leakage using a halogen leak detector.
Perform the operation as follows:
![]() |
Using the halogen leak detector, check the refrigerant line, especially at the connection points, for leakage.
If no gas leakage is detected from the drain hose, remove the blower motor from the cooling unit. Insert the halogen leak detector sensor into the unit and perform the test.
Disconnect the pressure switch connector and leave it for approximately 20 minutes. Bring the halogen leak detector close to the pressure switch and perform the test.
| 15. PERFORM YAW RATE SENSOR ZERO POINT CALIBRATION |
| 16. CHECK YAW RATE SENSOR |