VANE PUMP > INSPECTION |
| 1. INSPECT VANE PUMP SHAFT AND BUSH IN VANE PUMP FRONT HOUSING |
![]() |
Using a micrometer, measure the outer diameter [a] of the vane pump shaft.
Using a vernier caliper, measure the inner diameter [b] of the vane pump front housing bush.
Calculate the oil clearance.
Oil clearance = Inner diameter of the bush [b] - Outer diameter of the shaft [a]
| 2. INSPECT VANE PUMP ROTOR AND VANE PUMP PLATE |
![]() |
Using a micrometer, measure the thickness of the vane pump plates.
![]() |
Using a feeler gauge, measure the clearance between the side face of the vane pump rotor groove and the vane pump plate.
| 3. INSPECT PRESSURE PORT UNION |
Visually check the pressure port union for fluid leaks. If there is a leak, replace the vane pump assembly.
| 4. INSPECT TOTAL PRELOAD |
Check that the pump rotates smoothly without abnormal noise.
Temporarily install the service bolt.
| Thread diameter | Thread pitch | Bolt length |
| 10 mm (0.394 in.) | 1.25 mm (0.0492 in.) | 50 mm (1.97 in.) |
![]() |
Using a torque wrench, measure the pumps rotating torque.