Home › Drivetrain ยท DRIVE SHAFT / PROPELLER SHAFT › PROPELLER SHAFT ASSEMBLY (for 4WD)

PROPELLER SHAFT ASSEMBLY (for 4WD) > INSPECTION

for Preparation Click here



1. INSPECT PROPELLER SHAFT ASSEMBLY


    C160098
  1. Using a dial indicator, measure the propeller shaft runout.

    Maximum runout:
    1.02 mm (0.0402 in.)

    1. If the shaft runout is greater than the maximum, replace the propeller shaft.



2. INSPECT UNIVERSAL JOINT SPIDER BEARING


    C158513
  1. Inspect the spider bearing for wear or damage.

  1. Using a dial indicator, measure the spider bearing axial play by turning the yoke of the flange while holding the shaft tightly.

    Maximum runout:
    0.05 mm (0.00197 in.)

    1. If the spider bearing axial play exceeds the maximum, replace the spider bearing.