Home › Vehicle Interior › HEATING / AIR CONDITIONING › AIR CONDITIONING SYSTEM

AIR CONDITIONING SYSTEM > ECU Power Source Circuit

for Preparation Click here


DESCRIPTION

This circuit provides power to operate the air conditioning amplifier assembly.

WIRING DIAGRAM


E161578E04


INSPECTION PROCEDURE

1.INSPECT FUSE (A/C)


    E160643E12
  1. Remove the A/C fuse from the main body ECU (cowl side junction block LH).

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    A/C fuse
    Always
    Below 1 Ω



NG
REPLACE FUSE
OK


2.CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BATTERY AND BODY GROUND)
E127599E05
  1. Disconnect the H24 and H67 amplifier connectors.

  1. Measure the resistance and voltage according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    H24-14 (GND) - Body ground
    Always
    Below 1 Ω
    H67-20 (RGND) - Body ground
    Always
    Below 1 Ω

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    H24-21 (B) - Body ground
    Always
    11 to 14 V
    H67-24 (+B2) - Body ground
    Always
    11 to 14 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)