Home › Vehicle Interior › HEATING / AIR CONDITIONING › AIR CONDITIONING SYSTEM

AIR CONDITIONING SYSTEM > IG Power Source Circuit

for Preparation Click here


DESCRIPTION

When the ignition switch is turned ON, positive (+) battery voltage is applied to the air conditioning amplifier assembly.

WIRING DIAGRAM


E146515E07


INSPECTION PROCEDURE

1.INSPECT FUSE (ECU-IG NO. 1)


    E160643E14
  1. Remove the ECU-IG No. 1 fuse from the main body ECU (cowl side junction block LH).

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    ECU-IG No. 1 fuse
    Always
    Below 1 Ω



NG
REPLACE FUSE
OK


2.CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BATTERY AND BODY GROUND)
E127571E10
  1. Disconnect the H24 amplifier connector.

  1. Measure the resistance and voltage according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    H24-14 (GND) - Body ground
    Always
    Below 1 Ω

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    H24-1 (IG+) - Body ground
    Ignition switch ON
    11 to 14 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)